The Department of Tourism issued new sanction for construction of entry exit point at Umling

Shillong, Oct 3: A new sanction has been issued by the Department of Tourism, Government of Meghalaya, for construction of Facilitation Centre (Entry Point) at Umling on the 29th of September, 2020.

This pre-fabricated facility is being constructed on the Government land belonging to the Transport Department which is already levelled and is ready for construction of the super structure.

The new proposal was required, given the need to integrate COVID 19 screening and testing facility along with the Facilitation Centre (Entry Point).

The construction of this Facilitation Centre (Entry Point) on the new land is expected to be finished by the end of November 2020 and the Facilitation Centre (Entry Point) is expected to be operational by December 2020.

The previous sanction for the Facilitation Centre (Entry Point) was withdrawn because significant time and cost would have been needed for land development and construction in the earlier identified land. This press statement issued by commissioner and secretary Tourism Department.

 

 

What Next?

Recent Articles

Leave a Reply

Submit Comment

*

Where to buy Vidalista Professional 20 Mg (Tadalafil) tablet